Plant Capacity 100 GMS/Day
Land & Building (Area 500 Sq.Mt.) Rs. 46 Lacs
Plant & Machinery Rs. 11 Lacs
W.C. for 3 Months Rs. 88 Lacs
Total Capital Investment Rs. 1.46 Cr.
Rate of Return 154%
Break Even Point 14%
Note: ITI can modify the Capacity and Project Cost based on your requirement.
Contents of the Project Reports
Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.
Gold a bright yellow metal with resplendent luster. It is exceedingly malleable and ductile. It can be beaten into the sheets so thin that 2,50,000 of them may be placed one over another to form a pile one inch in thickness, it can be drawn into wires so thin that a length equal to 50 miles weight just 1 oz. It does not oxidize in air or oxygen at any temp. It is unaffected by the hydrochloric acid, nitric acid and sulphuric acid, even at temp. 100oC. A mixture of hydrochloric acid (Aqua Regia) dissolves the metal. It is not attacked by the alkali hydroxides, sulphur and sulphur dioxide, but is acted upon by the hydrogens, bromine being the most active. It readily amalgamates with mercury, a properly which has been taken advantage of in the extraction of gold from antiferrous sand in which gold is present in a finely dispersed form.
Cost EstimationPlant Capacity 100 GMS/Day
Land & Building (Area 500 Sq.Mt.) Rs. 46 Lacs
Plant & Machinery Rs. 11 Lacs
W.C. for 3 Months Rs. 88 Lacs
Total Capital Investment Rs. 1.46 Cr.
Rate of Return 154%
Break Even Point 14%
Note: ITI can modify the Capacity and Project Cost based on your requirement.
Contents of the Project Reports
Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.